Gypsum Plaster Multi Finish
Snow-White Gypsum Plaster Multi Finish
Buy 1, Get 1 25% Off 🔥 — 🛒 Add 2 to Basket — Mix & Match PROTON
Snow-White Gypsum Plaster Multi Finish is a high-quality, ultra-smooth finishing plaster designed for final surface preparation on walls and ceilings. Ideal for renovation and new-build projects, it offers excellent workability, bright white colour, fast preparation time and a perfectly smooth finish. Suitable for professional trades and DIY users, supplied in grip-seal bags.
⭐ Key Uses
-
Final surface smoothing on walls and ceilings
-
Renovation finishing before painting or decoration
-
General interior plaster finishing applications
🧪 How to Use
1️⃣ Mixing the Plaster
-
Add 0.4 litres of clean water per 1 kg of plaster.
-
Mix until smooth and lump-free.
-
Allow 5 minutes to stand before applying.
2️⃣ Application – Wall or Ceiling Smoothing
-
Apply evenly using a trowel.
-
Maximum recommended thickness: 2 mm.
-
Work within the 90-minute working time for best results.
3️⃣ Drying Before Painting
-
Allow plaster to dry for 12 hours.
-
Ensure surface is completely dry before sanding or priming.
-
Apply paint or finish as desired.
📋 Product Details
Consumption: 1 kg per 1 m² per 1 mm thickness
Maximum Thickness: 2 mm
Preparation Ratio: 0.4 L water per 1 kg plaster
Ready to Apply: 5 minutes after mixing
Working Time: 90 minutes
Full Drying Time: 12 hours
Shelf Life: 12 months (supplied product is minimum 8 months remaining)
Grade: Construction Grade
Form: Fine Snow-White Powder
Packaging: Grip-seal bags
Available Sizes: 200g, 400g, 1kg, 2kg, 3kg, 4kg
📈 Other Names
-
Gypsum Finish Plaster
-
Multi-Finish Plaster
-
White Surface Smoothing Plaster
SEO Keywords: snow white gypsum plaster, multi finish plaster UK, wall finishing plaster, ceiling smooth plaster, gypsum white finish, PROTON gypsum plaster, fine surface plaster, renovation finishing plaster
❓ FAQ
1. How thick can I apply this plaster?
The maximum recommended thickness is 2 mm for a smooth, professional finish.
2. How long does it take to dry?
Full drying time is approximately 12 hours depending on ventilation and temperature.
3. How much water do I need when mixing?
Use 0.4 litres of water per 1 kg of plaster for perfect consistency.